3 Ton Lifting Magnet Manufacturer: RFQ & Factory Audit

Compare model ratings, test evidence and factory terms.

Build your manufacturer RFQ
Manufacturer application brief

Build a 3-ton manufacturer RFQ

Measurement units

Compare nominal mass and prepare supplier questions. Results update instantly; application capacity needs a manufacturer chart.

Screening range: >0–8,000 kg.

Screening range: >0–500 mm.

Screening range: >0–16,000 mm.

Nominal mass comparison only — application rating unverified

Selected nominal class
3,000 kg / 6,613.87 lb
Application working load limit
Unknown — request model-specific rating

Next: add operating conditions below, then copy this RFQ for manufacturer review.

Request engineering review / alternative equipment
Add geometry, conditions & crane data

Leave blank if unknown; no assumed equipment weight or crane rating.

Leave blank if unknown; no assumed equipment weight or crane rating.

Breakaway test discussion

Illustrative permanent-magnet 3:1 benchmark: 9,000 kgf (19,841.6 lbf). This is a force benchmark, not a permitted load. Confirm the standard edition, technology and test conditions. See evidence and scope.

Total suspended mass

Unknown — enter verified lifter and complete rigging tare. No generic tare estimate is used.

Conditions still to resolve

  • Thickness, span, material and surface: no capacity percentage or universal safe length is inferred. Supply a drawing and obtain the rated application chart.
  • Rounds need diameter; pipes need diameter and wall thickness. Width, center of gravity and contact area remain unknown.
  • Temperature and duty limits apply to the complete lifter. Confirm measured temperature, contact duration, cycles and release interlocks.
Draft request only. Required manufacturer documents are pending.
Preview / manually copy RFQ

Send the draft or request help with missing data

Inquiry Contacts

Email: [email protected]

WhatsApp: WhatsApp Engineering Desk

1. Four decisions before shortlisting a 3-ton manufacturer

Write the exact nominal class

A 6,000 lb model is about 278.45 kg below a 3,000 kg requirement. Compare nameplate values in the same unit.

NIST Handbook 44 (2026), Appendix C

Separate nominal mass from application WLL

The selected model still needs a rating for your thickness, grade, surface and geometry. No generic derating curve is supplied here.

ACI Hoist: PML operation manual

Include complete suspended mass

Use verified workpiece + lifter + beam + rigging mass when reviewing the crane rating. Unknown tare means an incomplete comparison.

OSHA 29 CFR 1910.179

Buy traceable evidence and support

Request a documented test method, unit traceability and operating limits. Scope summaries alone cannot certify a particular magnet.

ASME B30.20-2025: Below-the-Hook Lifting Devices

Nominal comparison is the first procurement gateChoose metric or US short tons → Compare exact nameplate mass → Request the application rating1. Choose metric or US short tons2. Compare exact nameplate mass3. Request the application rating
Nominal comparison is the first procurement gate: Choose metric or US short tons → Compare exact nameplate mass → Request the application rating.

Unit comparison — exact definitions, rounded display

Scroll horizontally to compare every column. Keyboard: focus the table and use the arrow keys.

Unit comparison — exact definitions, rounded display
Nominal descriptionKilogramsPoundsManufacturer request
3 metric tonnes3,0006,613.87Require 3,000 kg nominal marking and the application chart.
3 US short tons2,721.556,000Do not substitute for a 3,000 kg application.
Crane total suspended loadWorkpiece + verified complete tareConvert with 1 lb = 0.45359237 kgCheck the actual crane rating separately; no generic minimum crane size.

2. Factory audit: establish who designs, builds and tests

Use these recommended procurement gates to compare manufacturers on evidence. An in-house test bench or a documented specialist partner can both be valid. Ask who owns each engineering decision, rather than judging a vendor by an unsupported “factory direct” label.

Factory audit: establish who designs, builds and testsIdentify the responsible maker → Review design and test records → Resolve gaps before purchase1. Identify the responsible maker2. Review design and test records3. Resolve gaps before purchase
Factory audit: establish who designs, builds and tests: Identify the responsible maker → Review design and test records → Resolve gaps before purchase.

Factory qualification worksheet — buyer recommendations, October 2026

Scroll horizontally to compare every column. Keyboard: focus the table and use the arrow keys.

Factory qualification worksheet — buyer recommendations, October 2026
GateRequest from manufacturerDecision if missing
Design responsibilityLegal manufacturer, model revision, drawing owner and responsible engineer.Hold selection until technical accountability is clear.
Application ratingWritten capacity for the supplied material, geometry, thickness, surface and temperature.A catalogue rating alone is insufficient.
Test capabilityTest procedure, calibrated instrument identification, coupon details and serial-linked results.Ask for a documented witnessed test plan.
Production traceabilityUnit serial number, inspection records, material specifications and controlled assembly revision.Resolve mismatched reports before accepting equipment.
Lifecycle supportManual, maintenance schedule, repair route and contracted spare parts.Budget training and support before placing the order.

These gates are an editorial buying framework. They do not assert that a particular supplier has passed an audit. ASME’s public overview identifies the safety topics; the full standard and application documentation govern acceptance.

3. Thickness and contact: obtain the exact application chart

A nominal 3-ton rating does not determine the working load limit on an arbitrary plate. Pole geometry and the workpiece affect the magnetic circuit. This page has no validated 3-ton model data from which to calculate a capacity percentage, leakage field or universal minimum thickness.

Thickness and contact: obtain the exact application chartRecord section and contact → Obtain the model rating chart → Check the exact application1. Record section and contact2. Obtain the model rating chart3. Check the exact application
Thickness and contact: obtain the exact application chart: Record section and contact → Obtain the model rating chart → Check the exact application.

Known inputs versus unresolved application capacity — no inferred derating

Scroll horizontally to compare every column. Keyboard: focus the table and use the arrow keys.

Known inputs versus unresolved application capacity — no inferred derating
ConditionKnown from your inputStill unknown / evidence required
Thick flat plateMeasured thickness, grade and footprint.Model minimum thickness and rated contact area; thickness alone does not establish WLL.
Thin sheet or stacked plateIndividual sheet thickness and number of layers.Single-sheet handling capability, flex/peel limits and unintended second-sheet pickup controls.
Scale, rust or coatingSurface description; attach photos and measurements.Actual effective air gap and model-specific rating under that condition.
Round billetDiameter, length, grade and mass.Manufacturer round-load chart and pole fit; flat-plate rating does not transfer.
Hollow pipeOutside diameter and wall thickness, separately.Contact geometry and permitted pipe capacity; diameter is not wall thickness.

The ACI manual and Eclipse handling guidance support qualitative screening of thickness and contact. They do not support a universal “70–80 mm = full capacity” rule, a 40 mm cutoff or generic gauss values.

4. PML, EPM and battery systems: compare operating requirements

Compare architectures against your work cycle, operator access and failure response. Technology labels do not determine self-weight, handle effort, safe stand-off distance, power demand or an installed price. Request those values for the quoted system.

PML, EPM and battery systems: compare operating requirementsDescribe operating conditions → Compare controls and hazards → Confirm the supplied model1. Describe operating conditions2. Compare controls and hazards3. Confirm the supplied model
PML, EPM and battery systems: compare operating requirements: Describe operating conditions → Compare controls and hazards → Confirm the supplied model.

Technology comparison — questions to resolve before sourcing

Scroll horizontally to compare every column. Keyboard: focus the table and use the arrow keys.

Technology comparison — questions to resolve before sourcing
CriterionManual permanent (PML)Electro-permanent (EPM)Battery electromagnet
ActuationManual switching; evaluate handle access and locking.Electrical switching; confirm pulse supply and controller design.Battery-powered coil; confirm supply and duty requirements.
Power interruptionPermanent holding does not need continuous electrical supply; mechanical and contact risks remain.Confirm retained holding after completed magnetization and status monitoring with the manufacturer.Confirm loss-of-power response, alarms, reserve supply and controlled lowering procedure.
Production integrationRequest demonstrated switching effort and cycle suitability.Review interlocks, remote control and synchronization.Review charging, battery life and alarm checks.
Commercial comparisonObtain a written configured quote.Include controller, wiring and commissioning.Include batteries, charger and replacement costs.

The BSI scope distinguishes these magnet categories. No system is described here as “100% failsafe”; a power-loss feature does not establish secure contact or a permitted load.

5. Test evidence: distinguish breakaway force, rated load and crane testing

The tool’s 3:1 calculation is an illustrative permanent-magnet procurement benchmark, supported by a published manufacturer example. At 3,000 kg nominal it gives 9,000 kgf (about 88.26 kN); at 6,000 lb nominal it gives 18,000 lbf. It does not mean that a crane should lift three times its rating. Confirm the applicable factor and procedure for the selected magnet technology.

Test evidence: distinguish breakaway force, rated load and crane testingAgree the applicable standards → Separate force and load tests → Review signed test evidence1. Agree the applicable standards2. Separate force and load tests3. Review signed test evidence
Test evidence: distinguish breakaway force, rated load and crane testing: Agree the applicable standards → Separate force and load tests → Review signed test evidence.

Standards and evidence scope — reviewed 28 October 2026

Scroll horizontally to compare every column. Keyboard: focus the table and use the arrow keys.

Standards and evidence scope — reviewed 28 October 2026
ReferenceWhat it establishes hereWhat the buyer must confirm
ASME B30.20-2025Publisher scope covers below-the-hook device safety topics.Applicable clauses, technology, test factor and model documentation; overview is not a test certificate.
ASME BTH-1-2023Design criteria used with B30.20.Design category, fatigue service class and structural calculations selected by the qualified designer.
BS EN 13155:2020+A1:2025Publisher scope includes several magnet technologies and lifting beams.Current applicable text, amendments, test method and relevant conformity route.
OSHA 1910.179Crane rated-load and operating requirements; (k)(2) sets a test-load ceiling of 125% unless manufacturer recommends otherwise.Qualified test plan. This is not an instruction to overload, brake abruptly or test every magnet at 125%.
EU market dateRegulation (EU) 2023/1230 generally applies from 20 January 2027; some provisions apply earlier.On this review date, assess the Machinery Directive 2006/42/EC framework and the actual placing-on-market date. A standard listing alone does not prove CE compliance.

Breakaway is a separation force measured under documented conditions. Structural proof, crane load testing and application WLL are separate questions. OSHA also calls for avoiding sudden acceleration/deceleration during hoisting; do not use abrupt braking as a self-devised proof test.

6. Geometry, heat and span: define the engineered configuration

Specify the complete assembly before comparing offers. For a long or flexible workpiece, magnet count alone cannot establish balanced loading. For warm material, the magnet alloy’s laboratory limit cannot establish the temperature rating of the housing, controls, cables and contact system.

Geometry, heat and span: define the engineered configurationAttach a dimensioned drawing → Resolve support and limits → Approve the engineered layout1. Attach a dimensioned drawing2. Resolve support and limits3. Approve the engineered layout
Geometry, heat and span: define the engineered configuration: Attach a dimensioned drawing → Resolve support and limits → Approve the engineered layout.

OEM customization brief — conditions and alternatives

Scroll horizontally to compare every column. Keyboard: focus the table and use the arrow keys.

OEM customization brief — conditions and alternatives
ApplicationAsk the manufacturer to resolveAlternative if unresolved
Long or flexible plateWidth, unsupported span, deflection, center of gravity, unequal sharing, beam mass and magnet positions.An engineered lifting beam or rated mechanical handling system. No universal 3 m or 0.21 × L spacing rule.
Round or hollow sectionDiameter, wall thickness, pole fit, contact and dedicated rated load.Rated mechanical grabs / clamps suited to the section.
Hot workpieceMeasured surface temperature, contact time, duty and complete-system temperature rating.A validated hot-material handling system; do not select SmCo from temperature alone.
Non-magnetic 304 / 316 materialUnsuitability for this magnetic lifting request.Consider rated vacuum or mechanical equipment after surface and geometry review.

These are engineering review questions, not an executable support design. Contact and application limits must come from the quoted model and the responsible designer.

7. Landed cost: compare the same scope and keep unknowns visible

No current price list, stock record, warranty contract or production schedule has been verified for a 3-ton LiftMagnetics model. Obtain dated written terms. Compare the complete configured scope so a cheaper magnet does not hide beam, controller, inspection or commissioning costs.

Landed cost: compare the same scope and keep unknowns visibleNormalize the quote scope → Price delivery and support → Compare complete landed cost1. Normalize the quote scope2. Price delivery and support3. Compare complete landed cost
Landed cost: compare the same scope and keep unknowns visible: Normalize the quote scope → Price delivery and support → Compare complete landed cost.

Quote normalization worksheet — values pending supplier offers

Scroll horizontally to compare every column. Keyboard: focus the table and use the arrow keys.

Quote normalization worksheet — values pending supplier offers
Cost / termCurrent public statusMinimum written detail
Magnet and controlsPrice unknown.Exact model, controls, accessories, currency and validity.
Beam and riggingWeight and price unknown.Assembly drawing, verified tare and separately rated components.
Acceptance and commissioningScope and fees unknown.Test method, witness costs, inspection, training and sign-off responsibilities.
Packing and transportCarrier acceptance, gross mass and freight unknown.Packing method, destination, Incoterm, insurance and magnetic-material assessment if needed.
Lead time and warrantyNo promised delivery or warranty duration.Production milestones, exclusions, spares, repair route and written warranty terms.

This is a purchasing worksheet, not market-price research. The practical cost decision is to compare itemized quotations with the same application rating and delivery obligations.

8. Acceptance dossier: check traceability before commissioning

Agree the acceptance dossier in the purchase contract. Document checks can reveal missing evidence before shipment; they do not replace installation review, operator training or the qualified person’s acceptance decision.

Acceptance dossier: check traceability before commissioningMatch model and serial number → Review the evidence dossier → Resolve gaps before operation1. Match model and serial number2. Review the evidence dossier3. Resolve gaps before operation
Acceptance dossier: check traceability before commissioning: Match model and serial number → Review the evidence dossier → Resolve gaps before operation.

Recommended manufacturer deliverables — all pending until received

Scroll horizontally to compare every column. Keyboard: focus the table and use the arrow keys.

Recommended manufacturer deliverables — all pending until received
DeliverableInspect forUnresolved condition
Rating and operating manualNameplate WLL, application charts, geometry limits, inspection criteria and release sequence.Do not substitute a generic sales brochure.
Breakaway test recordModel / serial, measured force, coupon material, dimensions, thickness, finish, gap, temperature and instrument calibration.Do not infer application WLL from a peak-force video alone.
Structural design and inspectionAssembly design basis, rigging ratings and inspection / NDT plan where specified.A service class or NDT technique must be selected for the design, not guessed by this tool.
Conformity and commercial recordsApplicable jurisdiction, legal manufacturer, placing-on-market date and contract terms.Resolve declaration scope and date before acceptance.

ASME B30.20 and BTH-1 have complementary safety and design scopes. This editorial checklist does not impose a universal material grade, calibration accuracy class or inspection interval.

Ready to compare offers? Include the application drawing and request the missing manufacturer evidence.

Request a factory evidence review

9. Worked examples: assumptions, checks and pending decisions

These four hypothetical procurement examples are not customer case studies, supplied configurations or verified test results. They illustrate what to ask next.

50 mm plate, 2,800 kg, 3 m long

Assumption: A buyer wants manual operation for a flat mild-steel plate.

Check: Mass is below 3,000 kg nominal, but width, contact and model chart are still missing. No 90% thickness factor is assumed.

Decision / next step: Request the drawing-based application rating. If unavailable, keep the equipment selection open rather than moving to a larger nominal model by guesswork.

16 mm plate, 2,500 kg, 7 m long

Assumption: A shipyard wants to move a long flexible sheet.

Check: Flex, contact, single-sheet control and load sharing require engineering. Three 1,000 kg magnets do not automatically provide a 3,000 kg system rating.

Decision / next step: Request an engineered support layout, complete beam tare and verified assembly rating; compare suitable mechanical alternatives.

Round alloy billet, 2,600 kg, 140°C

Assumption: A rolling operation needs hot-material handling.

Check: A flat ambient rating cannot establish the permitted hot-round load. Diameter, contact time and the complete-system thermal limit are required.

Decision / next step: Request a validated hot-billet configuration or alternate handling method. Core chemistry alone cannot close this selection.

3,000 kg block on a 3,500 kg crane

Assumption: Assume verified lifter tare of 105 kg and complete rigging tare of 25 kg for arithmetic only.

Check: 3,000 + 105 + 25 = 3,130 kg, leaving 370 kg numerical headroom against the entered crane rating.

Decision / next step: The crane arithmetic is within rating; application WLL remains unverified. Confirm material, contact, model limits and the qualified lift review. The assumed masses are not product specifications.

10. Manufacturer RFQ and engineering FAQ

Units and application rating

Does 3 ton mean 3,000 kg or 6,000 lb?

Three metric tonnes are 3,000 kg, about 6,613.87 lb. Three US short tons are 6,000 lb, about 2,721.55 kg. Specify the exact class and both units on the RFQ and nameplate.

Can the builder approve a lift?

No. It compares entered mass with a nominal class and prepares an evidence request. Application WLL remains unknown until the manufacturer confirms the exact model and conditions.

Does 70 mm thickness guarantee full 3-ton capacity?

No universal threshold is established here. Obtain the selected model’s thickness chart and verify material, contact, surface, temperature and geometry together.

Can I use pipe diameter as thickness?

No. Record outside diameter and wall thickness separately, then request a pipe-specific rating and contact review. A flat-plate rating is insufficient.

Evidence: NIST Handbook 44 (2026), Appendix C; ACI Hoist: PML operation manual; Eclipse Magnetics: Key considerations for magnetic lifting

Testing and standards

What does the 9,000 kgf benchmark mean?

It is 3 × a 3,000 kg nominal class, expressed as a separation-force benchmark for a permanent-magnet discussion. It is not a permitted load, a universal technology factor or a verified test result.

Should I test a 3-ton crane by lifting 9 tonnes?

No. Do not apply a magnet breakaway benchmark as a crane load test. A qualified person must define separate test procedures and equipment.

Does OSHA require a sudden-braking 125% proof test?

No. Section 1910.179(k)(2) limits crane test loads to no more than 125% of rating unless otherwise recommended by the manufacturer. It is not a blanket magnet proof-test instruction; hoisting guidance requires avoiding sudden acceleration and deceleration.

Is EU 2023/1230 already generally applicable in October 2026?

Its general application date is 20 January 2027, while specified provisions apply earlier. Assess the Machinery Directive framework and actual placing-on-market date with the responsible conformity specialist.

Evidence: ASME B30.20-2025: Below-the-Hook Lifting Devices; ASME BTH-1-2023: Design of Below-the-Hook Lifting Devices; Eclipse Magnetics: Ultralift Plus; OSHA 29 CFR 1910.179; EUR-Lex: Regulation (EU) 2023/1230, Article 54

Technology and conditions

Should every 3-ton application use EPM?

No. Select against the complete application: operating cycle, switching access, control integration, power response, maintenance and written model limits. Capacity alone does not choose a technology.

Is an EPM system guaranteed safe during any blackout?

No universal guarantee is made. Confirm retained holding after completed magnetization, controller status and the specific failure response. Contact, temperature, mechanical damage and incorrect application remain relevant.

Can hot steel be lifted if the magnet core is SmCo?

Core chemistry alone is insufficient. Confirm the complete lifter’s temperature rating, heat-transfer conditions, contact duration and manufacturer-approved application.

When is a spreader beam needed?

When an engineered review requires distributed support for workpiece flexibility, contact, stability or load sharing. This page provides no universal length cutoff, magnet count or support spacing.

Evidence: BSI: BS EN 13155:2020+A1:2025; Eclipse Magnetics: Key considerations for magnetic lifting; Eclipse Magnetics: Ultralift Plus

Manufacturer selection and procurement

Which factory should I shortlist?

Shortlist manufacturers who identify the responsible designer, provide a model-specific application rating and offer traceable test evidence, manuals and support. No audited supplier ranking is presented here.

What is the confirmed lead time or warranty?

No current lead time, inventory or warranty duration has been verified for this application. Obtain a dated written offer that states configuration, acceptance tests, delivery milestones and exclusions.

What if I do not know the lifter tare or crane rating?

Leave those optional fields blank. The tool marks the hook comparison as pending. Request the complete assembly mass and verify the crane nameplate before an engineering acceptance review.

Can I still request help with incomplete inputs?

Yes. Invalid measurements pause clipboard export, and the draft flags missing values. The review contact remains available so you can send a drawing and ask for the minimum missing data.

Evidence: ASME B30.20-2025: Below-the-Hook Lifting Devices; ASME BTH-1-2023: Design of Below-the-Hook Lifting Devices

11. Method, evidence status and limitations

Evidence reviewed on . This guide combines public publisher scope summaries, a government crane rule, unit definitions and manufacturer examples. It is an editorial procurement aid, not a manufacturer audit or an independent test of a LiftMagnetics model.

Reproducible tool logic: metric tonnes × 1,000; US short tons × 2,000 × 0.45359237; inches × 25.4. Hook mass is workpiece plus user-entered verified complete tare. The optional crane comparison uses the user-entered rated mass. Both equipment values default to unknown. Unit toggles retain unrounded SI values.

Input limits: positive workpiece mass up to 8,000 kg, section up to 500 mm and length up to 16,000 mm. Optional tare accepts up to 8,000 kg; crane capacity up to 100,000 kg. These are form limits, not permitted operating ranges. Invalid required or supplied optional values pause export. Clipboard failure opens a manual-copy preview.

What remains unverified: actual application WLL, model self-weight, contact area, width, diameter, effective gap, thermal limits, support layout and equipment certification. No price, inventory, delivery date, field strength, universal saturation percentage or fabricated customer result is asserted.

Standards boundary: public ASME/BSI descriptions establish scope, not detailed clause compliance. The permanent-magnet 3:1 example is a procurement discussion aid; EPM and battery factors await confirmation. Applicable law and the full standards must be checked for the destination and supply date.

First recorded in this repository: . LiftMagnetics editorial team owns this guide. Next review: , or earlier when a cited standard or model instruction changes.Send corrections or updated documentation.

3-ton manufacturer RFQ software example: 2400 kg workpiece, 3000 kg nominal class, application rating unverified
Software output captured on 28 October 2026: metric mode, 2,400 kg mass, 45 mm section, 2,500 mm length; equipment tare and crane rating unknown. This reproduces the RFQ workflow and is not a physical test, supplier audit or customer result.
  • NIST Handbook 44 (2026), Appendix C

    Unit definitions and conversion tables. Does not establish a lifting magnet rating.

  • ASME B30.20-2025: Below-the-Hook Lifting Devices

    Public overview confirms scope and edition: marking, construction, inspection, testing, maintenance and operation. Full clauses require the standard; this page does not claim clause-level verification.

  • ASME BTH-1-2023: Design of Below-the-Hook Lifting Devices

    Public overview explains structural, mechanical and electrical design scope. Design category and fatigue service class must be selected for the actual application.

  • BSI: BS EN 13155:2020+A1:2025

    Publisher listing includes permanent, electric and electro-permanent lifting magnets. A scope listing alone does not establish a universal test factor, CE conformity or harmonized status.

  • EUR-Lex: Regulation (EU) 2023/1230, Article 54

    Regulation (EU) 2023/1230 generally applies from 20 January 2027, with specified provisions applying earlier. Check the placing-on-market date and applicable law.

  • OSHA 29 CFR 1910.179

    Overhead/gantry crane requirements: (n)(1) rated load, (n)(3)(iii)(a) avoiding sudden acceleration/deceleration, and (k)(2) test-load ceiling, unless otherwise recommended by the manufacturer.

  • ACI Hoist: PML operation manual

    Manufacturer guidance on magnetic circuit, workpiece thickness, material, contact and air gaps. Model instructions are examples, not certification of a LiftMagnetics product.

  • Eclipse Magnetics: Ultralift Plus

    A manufacturer example of 3:1 safety-factor language and distinct flat/round ratings. Its model capacities and limits must not be transferred to another lifter.

  • Eclipse Magnetics: Key considerations for magnetic lifting

    Manufacturer discussion of material, thickness and contact conditions. Used for qualitative screening only.

12. Request a manufacturer application review

Send the RFQ draft with a dimensioned drawing, measured workpiece mass, material, surface condition, temperature, cycle frequency, verified crane rating and destination. Ask the manufacturer to return a written application rating, evidence dossier and itemized quotation. Missing data can be reviewed first.

Inquiry Contacts

Email: [email protected]

WhatsApp: WhatsApp Engineering Desk

Return to the RFQ builder